Project's Last Run Result |
Top Previous Next |
The 'Project's Last Run Result' trigger condition prevents a build from starting when the specified project's last run result is either a success or failure.
Do not start when The project who's last run result is checked to determine whether the project should be triggered.
Last run result was The result that the specified project needs to have for the trigger condition not to be met. |